FORM UC-36 (REV. 09-2026)UCDP MANDATE: 2026-11-02
UADCHECKPre-submission inspection of UAD 3.6 packages

Purpose of this form

Inspect your UAD 3.6 package before your lender submits it.

Attach the submission ZIP your form software exports. UADCheck flags every fatal and warning the GSEs publish — explained in plain English, mapped to the exact spot on the form. A second opinion your E&O will appreciate.

Begin inspection →Free. No account. Never stored. Photos never leave your machine.

Days remaining until mandate

From NOV 2, 2026 every Fannie/Freddie submission must be UAD 3.6.

Published UAD rules
728
Of which Fatal
592
Fatals needed to bounce a package
1
Fee for this inspection
$0.00

Section 1 — Instructions

  1. 1a.

    Export your package

    In your form software, generate the UAD 3.6 submission package — the ZIP containing the XML, the report PDF, and the photos. Any vendor. We integrate with none and work with all.

  2. 1b.

    Attach it below

    Photos and PDF are inspected inside your browser and never uploaded. The XML is checked in memory and immediately discarded. No account required.

  3. 1c.

    Fix before your lender finds it

    Every fatal and warning, in plain English, with the official message ID and the exact form section to correct — before it becomes an unpaid revision cycle.

Section 2 — Scope of inspection (☒ = in service today · ☐ = pending)

  • Package integrity

    The SYS-level checks UCDP runs on the ZIP itself: exactly one XML, the report PDF present and matching the XML's reference, every photo referenced ↔ present.

  • Official GSE schema

    Your XML validated against the actual GSE UAD 3.6 XSD — every format, enumeration, and required structure, with line numbers.

  • UAD 3.6 Compliance Rules

    The published rule set behind UCDP's fatals and warnings (H-1 v1.5 — 728 rules, 592 of them Fatal). Every finding cites its official message ID and where to fix it on the form.

  • Freddie Mac findings layer

    Published FRE findings that otherwise surface only AFTER your lender submits — outside the GSE API your form software uses. First tranche live; growing weekly.

  • PDF ↔ XML consistency

    The mismatches reviewers bounce reports for: the PDF says one thing, the data file says another. Appraised value, subject address, city/ZIP, effective date — compared in your browser; the PDF never uploads.

Coverage grows weekly. Every inspection report states exactly which subset of the published rules it evaluated — see the complete message-ID reference.

Section 3 — Privacy declaration

The undersigned service declares that: (a) photos and the report PDF are inspected in the appraiser's browser and are never transmitted; (b) the report XML is checked in memory and discarded when the response is returned — it is not written to disk, logged, retained, used for training, or shared; (c) only non-identifying result counts are kept.

Records retainedNONEAccount requiredNO

Section 4 — Certification

Will this guarantee UCDP accepts your report? No — and be suspicious of anyone who says otherwise. UADCheck runs the published GSE rule set and tells you exactly which subset it covered. What it does is catch the fatals before they cost you an unpaid revision cycle.

Begin inspection →