FORM UC-36 (REV. 09-2026)UCDP MANDATE: 2026-11-02
UADCHECKPre-submission inspection of UAD 3.6 packages

UAD1505

WARNING

Official message text · Appendix H-1: UAD Compliance Rules — URAR, v1.5

The 'Date of Signature and Report' cannot be a future date.

Warning — the submission can still come back Successful, but the finding is surfaced to your lender's review team.

What triggers UAD1505

The published rule logic, verbatim:

If ExecutionDate is in the future

  • Required format: a full date, CCYY-MM-DD (e.g., 2026-03-15).
  • Maximum allowed value: Current + 1.
  • • Bound to MISMO data point ExecutionDate (%PV%) at MESSAGE/DOCUMENT_SETS/DOCUMENT_SET/DOCUMENTS/DOCUMENT/SIGNATORIES/SIGNATORY/EXECUTION/EXECUTION_DETAIL/

How to fix it

On the URAR, this lives at: Certifications → Signature → Date of Signature and Report (%PV%). Complete or correct that field in your form software, regenerate the package, and re-check before submission.

The free UADCheck inspection evaluates UAD1505 automatically — attach your package and see in seconds whether it fires.

Begin inspection →

Related messages

Source: Appendix H-1: UAD Compliance Rules — URAR, v1.5 (public GSE document). Verified against the published spreadsheet; not affiliated with Fannie Mae or Freddie Mac.